2014-04: Engineering Department Fourth Quarter Report

Download Fourth Quarter Report

  • McConnell to Standeven Water Main Upgrade
  • Annis Road Pump Station Upgrade
  • Weeden Drive Booster Pump Station
  • Ford-Nevin Water Main Installation
  • Biological Treatment System Expansion Phase 1
  • Digester Gas Boiler Installation
  • 2014 Culvert Inspection Program
  • Prest Road Roundabouts Project Update
  • Vedder Bridge Replacement
  • Fraser Valley Express (FVX)
  • Transit Bay Paving
  • Transit Shelter Expansion
  • Vedder at Keith Wilson - Eastbound Left-Turn Signal
  • Luckakuck at Mall access - Pole Replacement and Load Reduction
  • Thornton Slide
  • Trans-Canada Highway Signage
  • Sardis Rail Trail
  • 2015 Staff Retreat
  • Back to School
  • School Zone Signage
  • Kindness Crew
  • Household Hazardous Waste Day
  • Shred-a-Thon
  • Waste Reduction Month
  • Pumpkin Composting
  • Collinson Pump Station
  • Snowpack Report
Attachments
Description Date File Size
2014 Fourth Quarter Report 2015-01-21 3.88MB