2014-03: Engineering Department Third Quarter Report

Download Third Quarter Report

  • McConnell to Standeven Water Main Upgrade
  • Sunset Drive Water Main Upgrade
  • South Trunk Sewer Upgrade Phase 3
  • Biological Treatment System Expansion Phase 1
  • Weeden Drive Booster Pump Station
  • Commercial Vehicle Inspections
  • Roundabout Open House
  • Network Screening Study
  • 2012-2016 Bridge Inspection Program
  • Tyson Road Roundabouts Project Update
  • Bailey Sanitary Force Main Upgrade - Storm Sewer Phase 1
  • 2014 Asphalt Rehabilitation and Shoulder Paving
  • Transit
  • Thornton Road Reconstruction
  • Vedder Road Pedestrian Signals
  • Traffic Signal Upgrades
  • Concrete Works
  • River Clean Up Events
  • Tzeachten Open House
  • Bailey Landfill Maintenance
  • 2014 Vedder River Sediment Removals
  • Fall City-Wide Garage Sale
Attachments
Description Date File Size
2014 Third Quarter Report 2014-10-24 7.15MB