The City of Chilliwack is currently undertaking the construction of a new Operations Centre on Luckakuck Way which requires the design and construction of one (1) Fire Pump Test Drafting Station for the City’s fleet of fifty (50) fire pump trucks.
The Fire Pump Test Drafting Station Project Work shall include, but not be limited to, the following:
Design; Engineering, inspection, and final field review; Construction; Supply of all hose fittings and connections; Finished design to allow for 75mm of asphalt concrete. |