WORK: Approximately 410m of road construction within a 25m right of way and a further 320m of road within a 20m right of way. Construction will include the installation of a pre-fabricated sanitary lift station, sanitary sewers, storm sewers including an outfall into the Chilliwack River & environmental compensation works, water works including an elevated water-main crossing over the Chilliwack River, street lighting, traffic signals and intersection improvements at Yale Road and other related works.
BID SECURITY: Bid Security in the amount of 10%
BONDING: Performance Bond and Labour and Materials Payment Bond, each in the amount of 50% of the Contract Price.
Tender Documents and drawings can be obtained on or after May 3rd, 2006 from the following at no cost:
City of Chilliwack, Main Reception Hall 8550 Young Road Chilliwack, B.C.
or may be downloaded from the City of Chilliwack's web site at www.chilliwack.com/bids.
Reference documents and drawings will be available for viewing at the offices of Wedler Engineering Ltd. located at:
Wedler Engineering Ltd. 201-9300 Nowell Street Chilliwack, B.C.
Inquiries should be directed to Mr. Andrew Gower, P. Eng., PE Contract Administrator with Wedler Engineering at telephone number 604-792-0651. The lowest or any tender may not necessarily be accepted. |