2016-02: Engineering Department Second Quarter Report

Download Second Quarter Report

  • Annis Road and Weeden Drive Pump Station Upgrades
  • 2016 Utilities Project
  • 2016 Water and Sewer Combo Project
  • 2016 Asphalt Rehabilitation and Shoulder Paving
  • Road Base Reinforcement
  • Traffic Signal Video Detection
  • Live Traffic Data
  • Safer School Travel
  • Training
  • Sheffield Way
  • Roadway Markings
  • Concrete Wheelchair Ramps
  • Prest Road Roundabouts
  • Vedder Bridge Replacement Design-Build Project
  • Public Engagement
  • Earth Month
  • Green Commuter Challenge
  • Shred-A-Thon and Food Drive
  • Fraser River Freshet
  • Town Dyke Preliminary Design

Attachments
Description Date File Size
2016 - Second Quarter Report 2016-08-19 4.39MB