2016-01: Engineering Department First Quarter Report

Download First Quarter Report (2016)

  • Annis Road and Weeden Drive Pump Station Upgrades
  • Marble Hill Well Source Development
  • Chilliwack Mountain Zone 2 Pressure Reducing Valve
  • (PRV) Station Upgrade
  • 2016 Water and Sewer Combo Project
  • Roadway Reflectors
  • Crack Sealing
  • Roadway Markings
  • 2016 Asphalt Rehabilitation and Shoulder Paving
  • Road Base Reinforcement
  • Vedder Bridge Replacement Design-Build Project
  • BikeBC Application
  • Traffic Signal Video Detection
  • Distracted Driving
  • Safer School Travel
  • Commercial Vehicle Project
  • Prest Road Roundabouts
  • Bailey Sewer Force Main / Teskey Creek Storm Trunk
  • Winner of Sustainability Excellence Award
  • Christmas Tree Composting
  • Fraser River Clean-Up
  • Bailey Landfill Operational Changes
  • Sunday Opening
  • Organic Waste Processing Services
  • Asbestos Waste Disposal
  • Bailey Landfill East Cell Liner Project
  • Organic Waste Diversion Planning
  • Snowpack Report and Freshet Preparation
  • McGillivray Pump Station Upgrade project
  • Vedder Canal West Dyke (Right Bank) Upgrades – Preliminary Design
  • 2016 Vedder River Gravel Management
Attachments
Description Date File Size
2016 - 01: Engineering First Quarter Report 2016-05-17 4.92MB