2015-04: Engineering Department Fourth Quarter Report

Download Fourth Quarter Report

  • Annis Road and Weeden Drive Pump Station Upgrades
  • Camp River Road Water Main Installation
  • Wastewater Treatment Plant Inlet Works Upgrade
  •  Marble Hill Well Source Development
  •  Biological Treatment System Expansion Phase 1
  • Vedder Bridge Replacement
  •  Prest Road Roundabouts
  •  Asphalt Rehabilitation and Shoulder Paving
  • Corbould at Lewis - Multi-Way Stop Installation
  • Traffic Management
  • School Zone and Playground Zone Reflective Panels
  • Concrete Works Design
  • Annual Traffic Count Program
  • Household Hazardous Waste Day
  • Waste Reduction Month
  • Shred-a-Thon
  • Pumpkin Composting
  • Green Christmas
  • Residential Curbside Organic Waste Program
  • Collinson Pump Station Upgrade Project
  • East Dyke (Young Road) Upgrade Project

Description Date File Size
2015 Fourth Quarter Report 2016-02-05 3.58MB