2015-03: Engineering Department Third Quarter Report

Download Third Quarter Report

  • Annis Road and Weeden Drive Pump Station
  • Camp River Road Water Main Installation
  • Biological Treatment System Expansion Phase 1
  • Southlands Drive Water Main Upgrade
  • Chilliwack Mountain Zone 2 Pressure Reducing Valve (PRV Station Upgrade)
  • Well #5 Testing
  • Vedder Bridge Replacement
  • Prest Road Roundabouts
  • Vedder Road South Pre-Design
  • Concrete Works
  • Roadway Markings
  • Back to School
  • Hey Neighbour, Slow Down
  • Yale / Vedder / Kerr
  • 2015 Asphalt Rehabilitation and Shoulder Paving
  • Bailey Road Japanese Knotweed Control
  • Road Base Reinforcement
  • Transit Shelter Installation
  • Crosswalk Installation
  • Traffic Signal Improvements
  • Bailey Landfill Financial Plan Update
  • Adopt a River Clean Up Event
  • Residential Curbside Organic Waste Program
  • Tzeachten Open House
  • Adopt a Road and Adopt a River Program Update
  • Fall City-Wide Garage Sale
  • Collinson Pump Station Upgrade Project
  • East Dyke (Young Road) Upgrade Project

Attachments
Description Date File Size
2015 Third Quarter Report 2015-10-16 6.77MB