2015-01: Engineering Department First Quarter Report

Download First Quarter Report

  • McConnell to Standeven Water Main Upgrade
  • Annis Road and Weeden Drive Pump Station Upgrades
  • Ford-Nevin Water Main Installation
  • Camp River Road Water Main Installation
  • Biological Treatment System Expansion Phase 1
  • Digester Gas Boiler Installation
  • 2015 Asphalt Rehabilitation and Shoulder Paving
  • Young Road CN Rail Crossing Improvement
  • 2015 Shoulder Paving
  • Roadway Reflectors
  • Roadway Markings
  • Hope River Trail
  • Message Board
  • Yale / Vedder / Kerr Intersection Improvement Project
  • Curbside Collection Program - Christmas Tree Composting
  • Habitat Enhancement
  • March 28 Clean-Up: Gill Bar Area
  • Fraser River Clean-Ups
  • Bailey Landfill Leachate Control Project
  • Bailey Landfill Gas Collection System
  • Collinson Pump Station Upgrade Project
  • 2015 Snowpack Report
Attachments
Description Date File Size
2015 First Quarter Report 2015-04-28 3.10MB