2014-02: Engineering Department Second Quarter Report

Download Second Quarter Report

  • McConnell to Standeven Water Main Upgrade
  • Sunset Drive Water Main Upgrade
  • Biological Treatment System Expansion Phase 1
  • 2012 North Chilliwack Water Main Upgrade
  • South Trunk Sewer Upgrade Phase 3
  • Tyson Road Roundabouts Project Update
  • Mill Street Reconstruction
  • Bailey Sanitary Force Main Upgrade - Storm Sewer Phase 1
  • Public Engagement Events
  • Safer School Travel Program
  • 2014 Asphalt Rehabilitation and Shoulder Paving
  • Thornton Road Reconstruction
  • Roadway Markings
  • Vedder Road Pedestrian Signals and Traffic Signal Upgrades
  • Concrete Works
  • Earth Month
  • Community Clean-Ups: Over 30 Tonnes of Waste Collected by Volunteers
  • Scrap Metal Recycling: 34 tonnes of metal diverted
  • Semi-Annual City-Wide Garage Sale
  • School Workshops: Educating the Youth
  • Stream-side Restoration
  • Shred-A-Thon and Food Drive
  • Invasive Japanese Knotweed Management
  • Green Commuter Challenge
  • 2014 Fraser River Freshet
  • Collinson Pump Station Upgrade
  • Old Orchard Road Sheet Piles and Road Repair

Attachments
Description Date File Size
2014 Second Quarter Report 2014-08-20 4.09MB