2013-04: Engineering Department Fourth Quarter Report

Download Fourth Quarter Report

  • Introduction
  • Eastern Hillsides Balancing Reservoir
  • McGrath Road Water Main at CN Rail
  • Sunset Drive Water Main Upgrade
  • McConnell to Standeven Water Main Upgrade
  • Biological Treatment System Expansion
  • South Truck Sewer Upgrade
  • Commercial Vehicle Check
  • Car Seat Check
  • Impaired Driving
  • Downtown Painting
  • New Crosswalk Installations
  • Mill Street Project Update
  • 2013 Asphalt Rehabilitation and Shoulder Paving
  • Vedder at Thomas - Traffic Signal Upgrading
  • Traffic Detection Video Transmission
  • 2014 Snowpack Report
  • Bailey Landfill Design-Build Project
  • Bailey Landfill - East Cell Mitigation
  • Household Hazardous Waste Day
  • Waste Reduction Month
  • Christmas Shred-A-Thon
  • Site Renovations at Parr Road Green Depot
Attachments
Description Date File Size
2013 Fourth Quarter Report 2014-02-06 4.16MB